Employer: Ellatzite-Med AD and the Ministry of Environment and Water (MoEW), Bulgaria
Designer and contractor: Geotechmin OOD
Description of the project:
In 2004, after a tender procedure under the Bulgarian Public Procurement Law, Geotechmin OOD was nominated as a designer and contractor of the project "Reclamation of Benkovski-1 Tailings Pond". The proposed designs were approved by the Interdepartmental Expert Committee to the MoEW.
The project is divided into two subprojects which include the following works:
Subproject 1: Finalizing the Reclamation of the Slope and the Beach
- reclamation of the downstream slope – 710 decares, including:
- restoration of erosive areas and old ditches; additional reclamation – 95.60 decares
- construction of berms, dewatering structures and collectors
- forming of the slope and recultivation of the crest – 40,500 cub.m.
- reclamation of the beach – 962 decares
Subproject 2: Reclamation of the Lake
- dewatering – 402,000 cub.m.
- drying, consolidation and restoration of the dewatered area – 795.7 decares
- construction of a surface water lowering facility
Common for subprojects 1 and 2:
- quarrying and transportation of earth mass – 500,000 cub.m.
- biological recultivation – grassing, forestation, fertilizing, seeding, sprinkling, earthing up, mowing
https://geotechmin.com/en/history/completed-projects/91-energy-and-environment/370-relamation-of-benkovski-1-tailings-pond#sigFreeId6b5139ab81