History

Employer: Ellatzite-Med AD
Designer-Technologist: Mitsubishi Materials Techno Corporation (MMTEC), Japan
Designer on Bulgarian part: Geoproject EOOD
Contractor: Geostroy AD
Project implementation period: June 2012 – August 2014

Description of the project:

A wastewater treatment facility was built at level 840 m in Ellatzite Mine Complex to purify mine effluents by applying an innovative for Bulgaria technology of the Japanese company MMTEC. The main processes are: neutralization, sludge recirculation and reneutralization, which are controlled in a fully automated operational cycle. The successful commissioning of the new facility has improved the condition of the main water intake in the discharge area of treated waters - the Malak Iskar River.

The main structures executed under heavy geological and weather conditions are as follows:

  • standard radial thickener, 35 m in diameter
  • neutralization tank
  • administrative building
  • hydrated lime storage bin with capacity of 100 cub.m
  • sand filter with 3 sections, washing water tank, washed water tank, treated water tank
  • reneutralization tank
  • sulphuric acid storage tank
  • shafts and wastewater collecting pipelines
  • access roads and bridge structures

The wastewater treatment facility is part of a complex wastewater management system on the territory of Ellatzite mine.

History

Truck

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet.

Storage

Vero eros et accumsan et iusto odio dignissim qui blandit praesent luptatum zzril delenit augue duis dolore te feugait.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper.

This website uses cookies, if you continue to use our website you confirm that you consent with our cookies policy.