History

EmployerRoad Infrastructure Agency
Contractor: “Struma Lot 3.3” Consortium (comprising Patstroy-92 AD and Geostroy AD)
Project implementation period: 2015 – 2018

Description of the project:
Geostroy AD and Patstroy-92 AD together with their partners from “Struma Lot 3.3” Consortium completed the construction of Lot 3.3 between Kresna and Sandanski from km 397+000 to km 420+624 under the project Struma Motorway – Lot 3.

The total lenght of Lot 3.3 is about 23.6 km. The main part of the new motorway passes alongside the River Struma and the existing Е-79 road.

The project envisages the construction of 9 large bridges in total length of 980 m, 2 road junctions near the village of Strumyani and near the town of Sandanski and a great number of site-specific road construction facilities and adjoining infrastructure.

The project is financed under Operational Programme Transport and Transport infrastructure 2014 – 2020 and is implemented in accordance with the contractual terms of FIDIC, Yellow Book.

History

Truck

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet.

Storage

Vero eros et accumsan et iusto odio dignissim qui blandit praesent luptatum zzril delenit augue duis dolore te feugait.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper.

This website uses cookies, if you continue to use our website you confirm that you consent with our cookies policy.