History

Employer: Metropoliten JSC - Sofia Municipality
Contractor: Geometro Zemlyane Consortium
Project implementation period: 2016-2019

In 2019, Geometro Zemlyane Consortium with a leading partner Geostroy AD and Transremontstroy EAD and BIAS-M EOOD as members completed the project for design and construction of Zemlyane Metro Depot. The facility is used for rolling stock maintenance and a train stabling area for Metro Line 3. The project is financed under Operational Programme “Transport and Transport Infrastructure” 2014-2020.

Description of the project:

The metro depot is partially situated on the territory of the existing Zemlyane Bus Garage. The works completed under the project include: construction of 400 m metro rail lines, a train shed for 26 trains, а two-level repair shop, а four-storey administrative building with 20 parking spaces, a garage for specialized vehicles, a heating station building - a boiler compartment, a train wash on a separate track, а 98-m long manoeuvre track, a “hot reserve” spare track, a separate track towards the open space storage area south of the repair shop, a power substation, open space storage areas, etc.

History

Truck

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet.

Storage

Vero eros et accumsan et iusto odio dignissim qui blandit praesent luptatum zzril delenit augue duis dolore te feugait.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper.

This website uses cookies, if you continue to use our website you confirm that you consent with our cookies policy.