History

Employer: Umicore Med AD
Contractor: Geotechmin OOD
Project implementation period: 2000 – 2002

Description of the project:
This project occupies a central place in the investment program of Umicore Med for removal of old environmental damages. ОЕС Bulgaria EOOD is the general contractor, and Geotechmin is the main sub-contractor.

Conducted works:
Excavation works, landscaping, surface water drainage, technical recultivation and consequent biological recultivation, as follows:

  • excavated slag – 102,200 cub.m.
  • embankment for technical recultivation – 58,000 cub.m.
  • embankment with soil and topsoil – 48,500 cub.m.
  • pipe culvert (diameter 500 mm) and surface drainage ditches – 1,150 m
  • reinforced concrete fence – 1,700 m
  • laying of grass mixes and bio-blankets – 139 decares
  • erection of piezometers (depth 18 m) – 3 pcs.

History

Truck

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet.

Storage

Vero eros et accumsan et iusto odio dignissim qui blandit praesent luptatum zzril delenit augue duis dolore te feugait.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper.

This website uses cookies, if you continue to use our website you confirm that you consent with our cookies policy.