Employer: Sofia Municipality
Contractor: Joint Venture Geotechmin–Unieco
Construction works executed by Geotechmin OOD: 75%
Project implementation period: August 2011 – October 2012
Description of the project:
This is the first stage of Project "Integrated System of Municipal Waste Treatment Facilities for Sofia Municipality". It is funded under EU Operational Programme "Environment 2007-2013", Priority axis 2 "Improvement and Development of Waste Treatment Infrastructure". Other sources of financing include national funds, Sofia Municipality budget and a loan from the European Investment Bank.
The construction activities are carried out on an area of approximately 33 hectares in Sadinata district near the village of Yana, Kremikovtsi region. Joint Venture Geotechmin–Unieco has executed the following major sub-projects:
- Non-Hazardous Waste Landfill – two cells (37% of the total landfill capacity), supporting embankments, bottom insulation layer, leachate drainage system, drainage ditches for surface water, underground water drainage system, landfill gas collection and destruction equipment
- Wastewater Treatment Plant (WWTP) – construction of a technological building, 3 buffer reservoirs for wastewater, pumping stations, a mixer, a sieve and a sand filter; installation of basic and specialized equipment
- Reception Area – administrative building, automobile repair shop and garage, transformer station, parking area, check-point, weighbridges, cleaning and disinfection station
In addition to these sub-projects the scope of work also includes surface and underground infrastructure – water supply and sewerage, electrical supply (including lighting), landscaping and permanent fencing, service roads.
Conducted works:
- excavation works – 186,000 cub.m.
- earth filling works including with clay, sand and gravel – 223,000 cub.m.
- concrete works – 12,000 cub.m.
- formwork – 25,000 sq.m.
- reinforcement – 750 tons
- steel structures – 55 tons
- HDPE membrane (insulation works) – 100,000 sq.m.
- pipelines – 20 km
- gabions – 1,200 pcs.