History

Employer: Agropolychim AD
Technological design: EnviroChemie, Germany
Full range construction design: Geoproject EOOD
Contractor: Geotechmin OOD
Project implementation period: August 2009 – June 2011

Description of the project:
The wastewater treatment plant is designed to function with a treatment capacity of 470 cubic meters per hour. Its purpose is to purify all phosphorus-containing wastewaters generated by Agropolychim’s production activities. The purification will be carried out through two main technological processes: treatment of wastewaters and treatment of the obtained sludge.

Geotechmin OOD has executed the following buildings and facilities:

  • filter press building – precast metal structure with facade cladding panels
  • surge tanks
  • reactors for neutralization and settling
  • reactor for secondary neutralization
  • reservoirs for rotating textile filters
  • tank for final control
  • settling tank
  • sludge thickeners
  • process pipelines

Type and quantity of completed works:

  • excavation works – 45,000 m3
  • fill works – 22,000 m3
  • formwork – 13,000 m2
  • concrete works – 10,000 m3
  • reinforcement works – 1,000 tons
  • metal structures – 220 tons

History

Truck

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet.

Storage

Vero eros et accumsan et iusto odio dignissim qui blandit praesent luptatum zzril delenit augue duis dolore te feugait.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper.

This website uses cookies, if you continue to use our website you confirm that you consent with our cookies policy.