Employer: Road Infrastructure Agency
Contractor: Patstroy-92 AD as a partner in Consortium "Struma-1"
Project implementation period: 2011 – 2013
Description of the project:
Patstroy-92 AD and its partners in Consortium “Struma-1” have executed Lot 1 of Struma Motorway which is part of the transport axis Vidin – Sofia – Kulata, included in the Trans-European Priority Project No. 7 of TEN-T.
The construction is financed under the Operational Programme “Transport 2007-2013“. 80% of the funds have been granted by the EU Cohesion Fund and 20% have been provided from the State Budget.
Patstroy-92 has executed two motorway sections with a total length of 7.98 km. They are located from km 305+220 to km 310+300 and from km 319+100 to km 322+000. The construction works include “Dolna Dikanya” and “Dupnitsa North” road junctions, some main and auxiliary road facilities, infrastructure networks and retaining walls.
Conducted works:
- excavation works – 1,434,424 cub.m.
- backfill works – 665,199 cub.m.
- roadbed of unsorted crushed stone, road shoulders and a dividing strip – 308,905 cub.m.
- mechanical strengthening of several sections of the roadbed – 88,508 cub.m.
- asphalt works:
- bituminous prime and tack coats – 663,920 cub.m.
- asphalt mixtures for base course and binder course – 150,337 t
- asphalt mixtures for surface course – dense asphalt concrete type A and polymer-modified split mastic asphalt concrete – 244,308 sq.m.
- dewatering facilities, such as water collection and drainage systems, concrete-lined drainage ditches and protective trenches – 52,339 m
- relocation and repair of existing irrigation and water supply structures and construction of new pipelines – 1,659 m
- elastic protective fences, safety nets and 261 meters of silencing fence
- traffic signs and thermoplastic road markings
- reconstruction of a low-voltage power network, overhead lines, automation and telecommunication cables, construction of a 20 KV mast transformer substation
- concrete curbs –12,258 m
- landscaping of adjacent terrains