Employer and Contractor: Ellatzite-Med AD
Designer: Geoproject EOOD
Project implementation period: 2010-2026

A number of projects and initiatives have been undertaken to implement the Environment Protection and Recovery Programme for the Region of Ellatzite Deposit. One of them is the technical and biological reclamation of disturbed terrains. To date, approximately 30.5 hectares have been technically and biologically reclaimed at the East Waste Dumps, as well as more than 29 hectares at Benkovski-2 Tailings Pond.

The technical and biological reclamation of the downstream face areas of Benkovski-2 Tailings Pond will be completed in 2026. 

Current Projects

Truck

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet.

Storage

Vero eros et accumsan et iusto odio dignissim qui blandit praesent luptatum zzril delenit augue duis dolore te feugait.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper.

This website uses cookies, if you continue to use our website you confirm that you consent with our cookies policy.