New Production Line at Devnya Cement Plant
Geotechmin OOD is a subcontractor of the Chinese company CBMI Construction (part of SINOMA Group), which is the EPC contractor of a new cement production line with a capacity of 4,000 tons per day at Devnya Cement Plant. For its participation in this project, Geotechmin OOD received a plaquette and a special award in the category “Industrial Buildings – Technological Renovation and Expansion” at the traditional contest “Building of the Year” in December 2014. The event was organised under the patronage of the Ministry of Regional Development and Public Works with the support of sectoral organizations.
Within this project, Geotechmin built the reinforced concrete structures of the following facilities on the territory of Devnya Cement: a raw mill foundation; a preheater tower – the highest industrial tower in Bulgaria – about 130 meters high; a cylindrical reinforced concrete silo with 18 m diameter and a height of 72 m; buildings, foundations, and towers.
Employer:
Devnya Cement ADContractor:
CBMI ConstructionSubcontractor:
Geotechmin OODProject implementation period:
2012 - 2014Date:
July 2023