HEPP Chereshovitsa EOOD

HEPP Chereshovitsa EOOD specializes in the field of construction and operation of electric power plants using renewable energy sources.

The company owns and operates Chereshovitsa Hydroelectric Power Plant with an installed capacity of 550 kW in the vicinity of the town of Etropole. The annual production of electricity is about 2 million kWh.

The plant is part of Bulgaria’s energy generation system and is considered as a viable green investment in the region.